News

Pero’s Bridge: Crane to Lift Collapsed Bristol Footbridge Out of Harbour

today22nd November 2026

Background
share close

Updated · First published 22 Nov 2026

A crane is in place to lift Bristol’s famous Pero’s Bridge out of the harbour, three weeks after the landmark footbridge collapsed into the water – and the council hopes it will be back in use by spring 2027.

What happened to Pero’s Bridge?

The bridge, which links Narrow Quay with Canon’s Road, collapsed into the Floating Harbour at 11pm on Saturday 31 October. Footage showed it closing slowly before suddenly dropping. Nobody was hurt, and a small amount of hydraulic oil that leaked into the water was cleared by specialists.

Read more: Ukrainian Strike Drones to Be Built in UK as Defence Secretary Meets Zelenskyy in Kyiv

It had already been out of action since August, when it malfunctioned during a routine test lift and was left partly hanging.

What caused the collapse?

Councillor Andrew Brown, chair of the Harbour Committee, said part of the structure “slipped”. An engineering assessment suggests external vibration was the most likely contributing factor. A council report this month found the bridge had not been properly tested for almost a decade, because of the weight of the love-lock padlocks attached to it.

📬 The Energy BriefingTop news, sport and what's on in London, straight to your inbox. Free.

What happens next?

A crane on a barge will lift the bridge’s three spans out over the next few days and take them to Albion Dry Dock for inspection. The recovery is expected to cost around £280,000, which will come out of the £1.51 million refurbishment budget already approved. Bristol City Council hopes to reopen the bridge in spring 2027.

About the bridge

Designed by Irish artist Eilis O’Connell and opened in 1999, Pero’s Bridge is known for its horn-shaped sculptures, which act as counterweights for the section that lifts to let tall boats through.

Pero’s Bridge
Collapsed11pm, Saturday 31 October 2026
InjuriesNone
RecoveryCrane lifting three spans over the next few days
Recovery costAbout £280,000
Repair budget£1.51m
Hoped reopeningSpring 2027
Opened1999
[object Promise]

ITV News West Country (21 November 2026); Bristol City Council.

Written by: Energy Radio Newsroom